Product Details
Place of Origin: Shandong China
Brand Name: Shangqing Environmental Protection
Certification: Product Qualification Certificate
Model Number: SQMBR
Payment & Shipping Terms
Minimum Order Quantity: 1 unit
Price: RMB21800-32800
Delivery Time: 15-30 working days
Capacity: |
Customized |
Maintenance: |
Low |
Power Consumption: |
Low |
Control System: |
PLC |
Product Name: |
MBR Sewage Treatment Plant |
Lifespan: |
10-15 Years |
Power Supply: |
220V/380V/415V/440V |
Material: |
FRP/Stainless Steel/Carbon Steel |
Capacity: |
Customized |
Maintenance: |
Low |
Power Consumption: |
Low |
Control System: |
PLC |
Product Name: |
MBR Sewage Treatment Plant |
Lifespan: |
10-15 Years |
Power Supply: |
220V/380V/415V/440V |
Material: |
FRP/Stainless Steel/Carbon Steel |
Customized Small MBR Sewage Treatment Equipment with High Water Quality Low Maintenance
The MBR Sewage Treatment Plant is a small, integrated sewage treatment equipment that offers a combination of A/O and MBR technologies for a highly efficient sewage treatment process. It is designed for easy installation, either on-site or off-site, and requires minimal maintenance. Operating temperature range is from 0-50℃, and the odor removal is effective. Water quality is high after treatment, making it a reliable and cost-effective solution. This integrated sewage treatment plant is ideal for residential, commercial, and industrial applications. It is an environmentally friendly alternative to traditional sewage treatment systems that can reduce your water footprint and help protect our environment.
Technical Parameters | Details |
---|---|
A/O+MBR integrated sewage treatment equipment | Yes |
MBR sewage treatment equipment | Yes |
Operating Temperature | 0-50℃ |
Odor Removal | Yes |
Control System | PLC |
Power Supply | 220V/380V/415V/440V |
Capacity | Customized |
Water Quality | High Quality |
Installation | On-site/Off-site |
Material | FRP/Stainless Steel/Carbon Steel |
Maintenance | Low |
Lifespan | 10-15 Years |
Shangqing Environmental Protection's SQMBR MBR Sewage Treatment Plant is the perfect solution for improving wastewater treatment efficiency. It is certified and has a minimum order quantity of one unit, with a delivery time of 15-30 working days. It is low maintenance and has a low power consumption, providing high quality water. The power supply is 220V/380V/415V/440V. The A/O+MBR integrated sewage treatment equipment is designed to reduce the size and complexity of the plant, and is designed to meet the strict demands for sewage treatment. It can be used for both domestic and industrial wastewater treatment. The MBR sewage treatment equipment can be used for a variety of applications, such as food processing, chemical processing, and other industrial processes. The MBR process is efficient, reliable, and cost effective, making it a great choice for wastewater treatment.
MBR Sewage Treatment Plant Technical Support and Service
We provide complete technical support and service for our MBR Sewage Treatment Plant. Our team of highly trained technicians can provide service and support for installation, operation, maintenance and troubleshooting.
We offer a variety of services to ensure the success of your MBR Sewage Treatment Plant project. This includes designing and engineering support, installation and commissioning assistance, operation and maintenance training, and ongoing technical support.
We provide 24/7 emergency support, and our team of experts is always available to answer any questions or concerns you may have about your MBR Sewage Treatment Plant.
If you have any questions or need assistance with your MBR Sewage Treatment Plant, please contact us. We look forward to helping you achieve success with your project.
Packaging and Shipping for MBR Sewage Treatment Plant
The MBR sewage treatment plant is packaged in a wooden box with a size of 1.2m x 0.6m x 1.0m and a total weight of 200kg. The external wooden box is equipped with a waterproof liner and a cushioning material, and the internal product is firmly fixed to the box to ensure that the product is not damaged during transportation. The wooden box is also equipped with a lifting ring for convenient unloading and loading.
The MBR sewage treatment plant will be shipped by sea. All products will be inspected and tested before shipment to ensure that the product is in good condition before shipping. The lead time for delivery is usually about 30 days.