Shandong Shangqing Environmental Protection Technology
products
products
Home > products > MBR Sewage Treatment Plant > Membrane Bioreactor MBR Sewage Treatment Plant Low Maintenance 220V 380V 415V 440V

Membrane Bioreactor MBR Sewage Treatment Plant Low Maintenance 220V 380V 415V 440V

Product Details

Place of Origin: Shandong China

Brand Name: Shangqing Environmental Protection

Certification: Product Qualification Certificate

Model Number: SQMBR

Payment & Shipping Terms

Minimum Order Quantity: 1 unit

Delivery Time: 15-30 working days

Get Best Price
Highlight:

Membrane Bioreactor MBR Sewage Treatment Plant

,

Membrane Bioreactor 220V 380V

,

Membrane Bioreactor Low Maintenance

Control System:
PLC
Power Supply:
220V/380V/415V/440V
Maintenance:
Low
Material:
FRP/Stainless Steel/Carbon Steel
Capacity:
Customized
Product Name:
MBR Sewage Treatment Plant
Installation:
On-site/Off-site
Odor Removal:
Yes
Control System:
PLC
Power Supply:
220V/380V/415V/440V
Maintenance:
Low
Material:
FRP/Stainless Steel/Carbon Steel
Capacity:
Customized
Product Name:
MBR Sewage Treatment Plant
Installation:
On-site/Off-site
Odor Removal:
Yes
Membrane Bioreactor MBR Sewage Treatment Plant Low Maintenance 220V 380V 415V 440V

MBR Sewage Treatment Plant Low Maintenance 220V/380V/415V/440V

Product Description:

The MBR Sewage Treatment Plant is an advanced technology for treating wastewater and sewage. It utilizes a Membrane Bioreactor (MBR) system to provide efficient and reliable treatment with low power consumption. The plant is designed to remove pollutants and odors, and it has a one-year warranty. It is powered by 220V/380V/415V/440V and is capable of providing complete treatment with minimal energy usage. The MBR Sewage Treatment Plant is a highly effective and economical choice for wastewater and sewage treatment. It is ideal for A/O+MBR integrated sewage treatment equipment and A/O+MBR integrated sewage treatment equipment.

 

Features:

  • Product Name: MBR Sewage Treatment Plant
  • Installation: On-site/Off-site
  • Power Consumption: Low
  • Odor Removal: Yes
  • Control System: PLC
  • Operating Pressure: 0.2-0.6Mpa
 

Technical Parameters:

Name Value
Installation On-site/Off-site
Power Consumption Low
Control System PLC
Power Supply 220V/380V/415V/440V
Odor Removal Yes
Warranty 1 Year
Material FRP/Stainless Steel/Carbon Steel
Lifespan 10-15 Years
Product Name Small Integrated MBR Sewage Treatment Equipment
Maintenance Low
 

Applications:

Shangqing Environmental Protection's MBR Sewage Treatment Plant is a perfect combination of A/O+MBR integrated sewage treatment equipment, which is designed to provide an effective and economical solution to small and medium-sized wastewater treatment projects. It is characterized by its small size and low energy consumption, and is suitable for projects with limited space and low energy consumption requirements. This product has a minimum order quantity of 1 unit and a delivery time of 15-30 working days. It has a lifespan of 10-15 years, and is capable of odor removal. It has a power supply of 220V/380V/415V/440V, and is customizable in terms of capacity. It also has a Product Qualification Certificate, ensuring its quality and safety. This product is the perfect choice for small and medium-sized wastewater treatment projects, and has been proven to be an effective and reliable solution.

 

Customization:

We provide customizable services for MBR Sewage Treatment Plant. Our brand name is Shangqing Environmental Protection, and the model number is SQMBR. Our product is product qualified with certification from Shandong China. The minimum order quantity is one unit, and the delivery time is 15-30 working days. The maintenance is low, and it is designed with odor removal capability. The product name is MBR Sewage Treatment Plant, and it has a lifespan of 10-15 years. The control system is PLC. We specialize in Mbr sewage treatment equipment, Small integrated mbr sewage treatment equipment, and A/o+mbr integrated sewage treatment equipment.

 

Support and Services:

MBR Sewage Treatment Plant Technical Support and Service

We provide comprehensive technical support and service for our MBR Sewage Treatment Plant. Our support team is available 24/7 to provide assistance with installation, troubleshooting, and maintenance.

We offer answers to commonly asked questions, as well as detailed product manuals and installation instructions. Our technicians are available to answer any questions you may have. If you have an issue with your MBR Sewage Treatment Plant, we can provide on-site service and repairs.

We also provide regular maintenance services for MBR Sewage Treatment Plant. Our maintenance services include filter cleaning and replacement, pump and motor maintenance, and general system checks and repairs. We also offer a range of repair and replacement parts.

If you have any questions about our MBR Sewage Treatment Plant technical support and service, please don’t hesitate to contact us.

 

Packing and Shipping:

The MBR Sewage Treatment Plant is packaged in a corrugated cardboard box. The box size is 40 cm x 40 cm x 60 cm and the net weight is 20 kg. The box is labeled with the product name and logo. The product is securely packed in the box.

The package is shipped in a temperature-controlled truck with the necessary packing materials. The truck is equipped with GPS tracking devices and the shipment is monitored at all times. The package is insured against loss or damage and the customer is notified of any changes in delivery status.

 

FAQ:

Q: What is the brand name of MBR Sewage Treatment Plant?
A: The brand name is Shangqing Environmental Protection.
Q: What is the model number of MBR Sewage Treatment Plant?
A: The model number is SQMBR.
Q: Where is MBR Sewage Treatment Plant manufactured?
A: MBR Sewage Treatment Plant is manufactured in Shandong, China.
Q: Does MBR Sewage Treatment Plant have a product certification?
A: Yes, it has a Product Qualification Certificate.
Q: What is the minimum order quantity for MBR Sewage Treatment Plant?
A: The minimum order quantity is 1 unit.
Q: How long does it take to deliver MBR Sewage Treatment Plant?
A: It usually takes 15-30 working days for delivery.