Shandong Shangqing Environmental Protection Technology
products
products
Home > products > Integrated Sewage Treatment Plant > 150m3 Per Day Effluent Water Treatment Plant Sewage Treatment Equipment

150m3 Per Day Effluent Water Treatment Plant Sewage Treatment Equipment

Product Details

Place of Origin: Shandong China

Brand Name: Shangqing Environmental Protection

Certification: Product Qualification Certificate

Model Number: SQYWS

Payment & Shipping Terms

Minimum Order Quantity: 1 unit

Delivery Time: 15-30 working days

Get Best Price
Highlight:

150m3/D Effluent Water Treatment Plant

,

Effluent Water Sewage Treatment Equipment

,

150m3/D Sewage Treatment Equipment

Maintenance:
Easy
Efficiency:
High
Name:
Integrated Sewage Treatment Plant
Application:
Industrial
Process:
Aerobic/Anaerobic
Warranty:
1 Year
Power:
Low
Control:
PLC
Maintenance:
Easy
Efficiency:
High
Name:
Integrated Sewage Treatment Plant
Application:
Industrial
Process:
Aerobic/Anaerobic
Warranty:
1 Year
Power:
Low
Control:
PLC
150m3 Per Day Effluent Water Treatment Plant Sewage Treatment Equipment

150m³/D Advanced Design Easy Maintenance Water Treatment System

Product Description:

Integrated Sewage Treatment Plant

Our advanced Integrated Sewage Treatment Plant is designed to provide cost-effective water treatment solutions for processing raw sewage from residential and commercial areas. With low power consumption, our plant is made of high-quality stainless steel and requires minimal maintenance. It is available in a range of capacities, from 100m³/D to 10m³/D, and even up to 150m³/D and 200m³/D. It is equipped with an efficient aerobic/anaerobic process to effectively treat the sewage and remove pollutants.

The integrated sewage treatment plant is designed to reduce organic content, suspended solids, and other pollutants from the sewage. It also helps to reduce the Biological Oxygen Demand (BOD) and Chemical Oxygen Demand (COD) in the effluent. Furthermore, it can also be used for sludge dewatering and waste minimization.

Our integrated sewage treatment plant is easy to operate and maintain. It is well-suited for a variety of applications, such as industrial wastewater, municipal wastewater, and more. With its advanced design and low power consumption, our plant is a reliable and cost-effective option for wastewater treatment.

 

Features:

  • Product Name: Integrated Sewage Treatment Plant
  • Power: Low
  • Warranty: 1 Year
  • Application: Industrial
  • Control: PLC
  • Material: Stainless Steel
  • Capacity: 50m³/D, 10m³/D, 50m³/D
  • Automatic: Automatic
 

Technical Parameters:

Parameter Value
Name Integrated Sewage Treatment Plant
Operation Automatic
Material Stainless Steel
Efficiency High
Capacity 30m³/D, 100m³/D
Control PLC
Maintenance Easy
Power 0.5KW, 1KW
Process Aerobic/Anaerobic
Warranty 1 Year
 

Applications:

Integrated Sewage Treatment Plant 80m³/D, 30m³/D, 50m³/D, 80m³/D

Shangqing Environmental Protection SQYWS Integrated Sewage Treatment Plant is the most advanced treatment technology for industrial wastewater treatment. It is certified by Product Qualification Certificate and manufactured in China’s Shandong Province. The minimum order quantity is 1 unit and the delivery time is 15-30 working days. The process of the treatment is Aerobic/Anaerobic and maintenance is easy. It can be used in a wide range of industrial applications and the control is based on PLC. The efficiency of the plant is high.

 

Customization:

Integrated Sewage Treatment Plant

Brand Name: Shangqing Environmental Protection

Model Number: SQYWS

Place of Origin: Shandong China

Certification: Product Qualification Certificate

Minimum Order Quantity: 1 unit

Delivery Time: 15-30 working days

This Integrated Sewage Treatment Plant is designed to handle different capacity of sewage, including 50m³/D, 30m³/D, 20m³/D, 10m³/D, 5m³/D. It is applicable for industrial use with automatic operation and easy maintenance. It comes with a 1 year warranty.

 

Support and Services:

We provide technical support and services for Integrated Sewage Treatment Plant. Our experienced engineers are available to help you with any technical queries or problems you may have. We also offer comprehensive maintenance and repair services to ensure your plant is running at optimal efficiency. Our team of experts can also assist with installation, commissioning and training.

 

Packing and Shipping:

Packaging and Shipping of Integrated Sewage Treatment Plant

Integrated Sewage Treatment Plant (ISTP) components will be packaged and shipped in a secure, stable, and waterproof manner, depending on their size, shape, and weight. The following guidelines will help ensure that the ISTP components arrive in pristine condition.

  • Small components (e.g., valves, filters, and pumps) will be securely wrapped and packaged in bubble wrap and placed in boxes.
  • Larger components (e.g., tanks and control panels) will be placed on wooden pallets and then covered with waterproof tarps and shrink wrap.
  • The packaged components will be placed in containers and securely strapped.
  • The containers will be loaded onto trucks or ships for transport.
  • The containers will be tracked throughout the shipping process to ensure timely delivery.

These guidelines will help ensure that the ISTP components arrive in perfect condition and are ready for installation and use.

 

FAQ:

Q1: What is Integrated Sewage Treatment Plant?

A1: Integrated Sewage Treatment Plant, is an advanced sewage treatment equipment produced by Shangqing Environmental Protection, with the model number of SQYWS. It is designed to treat domestic sewage and industrial wastewater.

Q2: Where does Shangqing Environmental Protection produce the Integrated Sewage Treatment Plant?

A2: The Integrated Sewage Treatment Plant is produced in Shandong, China.

Q3: Does Integrated Sewage Treatment Plant have any certifications?

A3: Yes, the Integrated Sewage Treatment Plant has been certified with a Product Qualification Certificate.

Q4: What is the minimum order quantity for the Integrated Sewage Treatment Plant?

A4: The minimum order quantity for the Integrated Sewage Treatment Plant is one unit.

Q5: How long does it take to deliver the Integrated Sewage Treatment Plant?

A5: It takes 15-30 working days to deliver the Integrated Sewage Treatment Plant.