Shandong Shangqing Environmental Protection Technology
products
products
Home > products > Integrated Sewage Treatment Plant > 20m3/D Integrated Sewage Treatment Plant Aerobic Anaerobic Sludge Treatment System

20m3/D Integrated Sewage Treatment Plant Aerobic Anaerobic Sludge Treatment System

Product Details

Place of Origin: Shandong China

Brand Name: Shangqing Environmental Protection

Certification: Product Qualification Certificate

Model Number: SQYWS

Payment & Shipping Terms

Minimum Order Quantity: 1 unit

Delivery Time: 15-30 working days

Get Best Price
Highlight:

20m3/D Integrated Sewage Treatment Plant

,

Aerobic Anaerobic sludge treatment system

,

20m3/D Integrated sludge treatment system

Warranty:
1 Year
Capacity:
Customized
Power:
Low
Application:
Industrial
Operation:
Automatic
Efficiency:
High
Name:
Integrated Sewage Treatment Plant
Material:
Stainless Steel
Warranty:
1 Year
Capacity:
Customized
Power:
Low
Application:
Industrial
Operation:
Automatic
Efficiency:
High
Name:
Integrated Sewage Treatment Plant
Material:
Stainless Steel
20m3/D Integrated Sewage Treatment Plant Aerobic Anaerobic Sludge Treatment System

20m3/D Easy Maintenance Customized Capacity Water Treatment System

Product Description:

The Integrated Sewage Treatment Plant is designed to be advanced and easy to maintain. It is made of stainless steel and features a PLC controller for automatic operations. It is available in three sizes, namely 100m³/D, 200m³/D and 150m³/D, and is used for the treatment of sewage and the removal of pollutants. The plant is reliable and durable, and is able to meet the requirements of various types of wastewater treatment processes.

The Integrated Sewage Treatment Plant is equipped with advanced filtration equipment that is able to effectively remove suspended solids, colloids, bacteria, and other compounds, as well as chemical pollutants such as heavy metals and organic compounds. It also uses advanced oxidation processes to remove odors and colors. The plant is designed for maximum efficiency and ease of maintenance.

The Integrated Sewage Treatment Plant is designed to be safe and efficient. It is equipped with safety features such as emergency shutoff and automatic flow control. The plant is also equipped with alarms and monitors to ensure the safety of operation and personnel. The plant is easy to operate and maintain, and the efficient design ensures that it is able to meet the most stringent requirements of wastewater treatment.

 

Features:

  • Product Name: Integrated Sewage Treatment Plant
  • Operation: Automatic
  • Maintenance: Easy
  • Process: Aerobic/Anaerobic
  • Efficiency: High
  • Application: Industrial
  • Capacity: 80m³/D, 150m³/D, 30m³/D
 

Technical Parameters:

Parameter Value
Application Industrial
Design Advanced
Warranty 1 Year
Process Aerobic/Anaerobic
Efficiency High
Control PLC
Maintenance Easy
Name Integrated Sewage Treatment Plant
Capacity Customized (50m³/D, 80m³/D, 150m³/D, 200m³/D)
Operation Automatic
 

Applications:

Integrated Sewage Treatment Plant from Shangqing Environmental Protection

Shangqing Environmental Protection's Integrated Sewage Treatment Plant (Model Number: SQYWS) is a reliable wastewater treatment solution for industrial use. It is certified with a Product Qualification Certificate and is made of robust stainless steel to ensure long-term operation and maintenance. With its automatic operation, the plant requires minimal effort for upkeep, and is able to treat wastewater from 100m³/D to 20m³/D or 10m³/D.

The Integrated Sewage Treatment Plant from Shangqing Environmental Protection is ideal for industrial wastewater treatment and can be delivered within 15-30 working days with a minimum order quantity of one unit.

 

Customization:

Shangqing Environmental Protection provides customized services for Integrated Sewage Treatment Plant. The brand name is SQYWS and the model number is SQYWS. It is certificated with Product Qualification Certificate and it is made of stainless steel. The minimum order quantity is 1 unit and the delivery time is 15-30 working days. The maintenance is easy and the efficiency is high. It is applicable for industrial. The warranty is 1 year. It is available in 20m³/D, 200m³/D, 80m³/D.

 

Packing and Shipping:

Packaging and Shipping

Integrated Sewage Treatment Plant is shipped in a secure and sturdy container for safety. The product is packaged carefully to ensure all parts arrive in their original condition. The container is labeled with all relevant information such as product name, quantity, origin, destination, and contact information for the supplier.

The product is shipped via a reliable freight shipping company. The shipping company is responsible for the safe delivery of the product and is responsible for any damages or losses that may occur during transit. All shipping costs are the responsibility of the buyer.

 

FAQ:

Q: What is Shangqing Environmental Protection Integrated Sewage Treatment Plant?
A: Shangqing Environmental Protection Integrated Sewage Treatment Plant is a kind of wastewater treatment equipment for the purification of domestic and industrial wastewater.
Q: What is the model number of Shangqing Environmental Protection Integrated Sewage Treatment Plant?
A: The model number of Shangqing Environmental Protection Integrated Sewage Treatment Plant is SQYWS.
Q: Where is Shangqing Environmental Protection Integrated Sewage Treatment Plant manufactured?
A: Shangqing Environmental Protection Integrated Sewage Treatment Plant is manufactured in Shandong, China.
Q: What kind of certification does Shangqing Environmental Protection Integrated Sewage Treatment Plant have?
A: Shangqing Environmental Protection Integrated Sewage Treatment Plant has a Product Qualification Certificate.
Q: What is the minimum order quantity for Shangqing Environmental Protection Integrated Sewage Treatment Plant?
A: The minimum order quantity for Shangqing Environmental Protection Integrated Sewage Treatment Plant is 1 unit.
Q: How long does it take to deliver Shangqing Environmental Protection Integrated Sewage Treatment Plant?
A: It takes 15-30 working days to deliver Shangqing Environmental Protection Integrated Sewage Treatment Plant.